In this project, repair and maintenance work has been completed on a section of the surroundings of the 2nd Primary School premises, as well as waterproofing of the roof in the central school building and work on the sanitary facilities (W.C.) at the 3rd High School of Pyrgos.
The intervention site of the 2nd Primary School was located on the western side of the city, specifically on 28th October Street 49, while the 3rd High School is situated on the junction of Yiannitsa Street, southwest of the city of Pyrgos. The project aimed to improve and upgrade the upper school units to ensure the safe and comfortable stay of students both inside and outside the school buildings.
In the current project for the 2nd Primary School of Pyrgos, the completed works included the preparation of the substructure, repair and painting of perimeter walls, installation of reinforced membranes, and sealing with specialized water-stop pieces. Additionally, cleaning and shaping of the existing surrounding area, construction of terraces within the space, paving with cobblestones of various shades, placement of three iron doors, and coloring for the isolation of sections under development were carried out. Two benches were also installed, along with the supply and placement of two waste bins, and finally, landscaping and irrigation works were performed.
Furthermore, at the 3rd High School of Pyrgos, works included the dismantling of a section of the floor in the sanitary facilities (W.C.), removal of floor agreements, toilet bowls, and sewer pipes to isolate or eliminate the old network. Restoration of the stripped substructure and placement of new tiles in a similar shade, removal of decayed and damaged colors on the basement ceiling, preparation of surfaces for painting with careful removal of paint residues and sanding, and removal of stripping products were also carried out.
BEFORE:
AFTER: